Citation-entailment verification (does the source actually support the claim)
Checks that a cited source actually supports the sentence it's cited for.
IMPLEMENTED , rung 2 of 8 Recorded 29 July 2026
Technical
What it is
Citation-entailment verification.
Truth ladder
Where it stands
Rung 2 of 8: IMPLEMENTED
Code exists. Nothing has demonstrated that it behaves correctly.
Project record: IMPLEMENTED
- CONCEPT Designed or specified. No working code yet.
- IMPLEMENTED Code exists. Nothing has demonstrated that it behaves correctly.
- TESTED Automated tests exercise it in isolation, often against fixtures.
- INTEGRATED Wired into the rest of JARVIS and tested across component boundaries.
- PRODUCTION-REACHABLE The owner can reach it through the real runtime path, not only through a test harness.
- LIVE-PROVEN A bounded probe ran the real code path on a booted JARVIS on the real machine and recorded evidence. The project treats live evidence as expiring after 24 hours, so every live reading here shows the date it was taken.
- FORMALLY VERIFIED Its critical property is checked by a proof or exhaustive verification.
- RELEASE-QUALIFIED Passed every qualification gate for a named release.
Limits
Limitations
- Demoted by the AUDIT 03 cascade: it depends on a module whose own proof was demoted. Code and tests exist; no production reach was proven when the state was set (2026-07-29).
Record
Status history
- IMPLEMENTED , rung 2 of 8 Recorded state: IMPLEMENTED
Only states recorded in the public export are listed. Earlier states may exist in the project’s private ledgers.
Neighbours
Related capabilities
- Supporting AND contradicting evidence collection Collects evidence against a claim as well as for it.
- Claim-to-evidence graph Keeps a graph of which evidence supports which claim.
- Lawful video analysis (transcript + frames + timestamps) Analyses videos lawfully from transcript, frames and timestamps.
- Research reports with confidence and open questions Research reports state confidence and open questions.