Engineering contradiction review

A read-only check that flags when a design breaks a declared limit, or when the HUD shows a different revision from the one an analysis used.

LIVE-PROVEN , rung 6 of 8 Recorded 23 September 2026. Advanced Systems branch, not merged into production.

Technical

What it is

Findings such as ENVELOPE_EXCEEDED (“6 mm over the envelope limit”) and ANALYSIS_REVISION_MISMATCH (“the latest volume result belongs to revision 1, but the HUD is showing revision 2”); a watcher runs on the existing scheduler sweep and keeps identical finding keys across a restart.

Truth ladder

Where it stands

Rung 6 of 8: LIVE-PROVEN

A bounded probe ran the real code path on a booted JARVIS on the real machine and recorded evidence. The project treats live evidence as expiring after 24 hours, so every live reading here shows the date it was taken.

Qualified as PARTIAL: part of this capability is not at the rung shown.

Project record: CAP-L0064-01/03/04 COMPLETE, -02 PARTIAL

  1. CONCEPT Designed or specified. No working code yet.
  2. IMPLEMENTED Code exists. Nothing has demonstrated that it behaves correctly.
  3. TESTED Automated tests exercise it in isolation, often against fixtures.
  4. INTEGRATED Wired into the rest of JARVIS and tested across component boundaries.
  5. PRODUCTION-REACHABLE The owner can reach it through the real runtime path, not only through a test harness.
  6. LIVE-PROVEN A bounded probe ran the real code path on a booted JARVIS on the real machine and recorded evidence. The project treats live evidence as expiring after 24 hours, so every live reading here shows the date it was taken.
  7. FORMALLY VERIFIED Its critical property is checked by a proof or exhaustive verification.
  8. RELEASE-QUALIFIED Passed every qualification gate for a named release.

Limits

Limitations

  • Assemblies of separately placed objects are not combined yet.
  • Runs were analytic calculated fixtures, not measurements.
  • Proven on an isolated diagnostic core with synthetic test fixtures, not on the owner’s everyday runtime.

Record

Status history

  1. LIVE-PROVEN PARTIAL , rung 6 of 8 First published state.

Only states recorded in the public export are listed. Earlier states may exist in the project’s private ledgers.

Connected work

Connected work