Mission Control census

One bounded, read-only page from each owner of work (missions, objectives, recovery, projects, agents, jobs, research, tests) so the owner can see everything in flight.

INTEGRATED , rung 4 of 8 Recorded 23 September 2026. Advanced Systems branch, not merged into production.

Technical

What it is

At most 32 rows per owner; it never sweeps or executes; recorded test rows are labelled RECORDED_OUTCOME_NOT_CURRENT_VERIFICATION.

Truth ladder

Where it stands

Rung 4 of 8: INTEGRATED

Wired into the rest of JARVIS and tested across component boundaries.

Project record: INTEGRATED; body read route wired

  1. CONCEPT Designed or specified. No working code yet.
  2. IMPLEMENTED Code exists. Nothing has demonstrated that it behaves correctly.
  3. TESTED Automated tests exercise it in isolation, often against fixtures.
  4. INTEGRATED Wired into the rest of JARVIS and tested across component boundaries.
  5. PRODUCTION-REACHABLE The owner can reach it through the real runtime path, not only through a test harness.
  6. LIVE-PROVEN A bounded probe ran the real code path on a booted JARVIS on the real machine and recorded evidence. The project treats live evidence as expiring after 24 hours, so every live reading here shows the date it was taken.
  7. FORMALLY VERIFIED Its critical property is checked by a proof or exhaustive verification.
  8. RELEASE-QUALIFIED Passed every qualification gate for a named release.

Limits

Limitations

  • No canonical live proof yet, and no HUD view for it was found.

Record

Status history

  1. INTEGRATED , rung 4 of 8 First published state.

Only states recorded in the public export are listed. Earlier states may exist in the project’s private ledgers.

Connected work

Connected work