Mission Control census
One bounded, read-only page from each owner of work (missions, objectives, recovery, projects, agents, jobs, research, tests) so the owner can see everything in flight.
INTEGRATED , rung 4 of 8 Recorded 23 September 2026. Advanced Systems branch, not merged into production.
Technical
What it is
At most 32 rows per owner; it never sweeps or executes; recorded test rows are labelled RECORDED_OUTCOME_NOT_CURRENT_VERIFICATION.
Truth ladder
Where it stands
Rung 4 of 8: INTEGRATED
Wired into the rest of JARVIS and tested across component boundaries.
Project record: INTEGRATED; body read route wired
- CONCEPT Designed or specified. No working code yet.
- IMPLEMENTED Code exists. Nothing has demonstrated that it behaves correctly.
- TESTED Automated tests exercise it in isolation, often against fixtures.
- INTEGRATED Wired into the rest of JARVIS and tested across component boundaries.
- PRODUCTION-REACHABLE The owner can reach it through the real runtime path, not only through a test harness.
- LIVE-PROVEN A bounded probe ran the real code path on a booted JARVIS on the real machine and recorded evidence. The project treats live evidence as expiring after 24 hours, so every live reading here shows the date it was taken.
- FORMALLY VERIFIED Its critical property is checked by a proof or exhaustive verification.
- RELEASE-QUALIFIED Passed every qualification gate for a named release.
Limits
Limitations
- No canonical live proof yet, and no HUD view for it was found.
Record
Status history
- INTEGRATED , rung 4 of 8 First published state.
Only states recorded in the public export are listed. Earlier states may exist in the project’s private ledgers.
Connected work
Connected work
- Changelog Cognition and operator lanes adopted 23 Sept 2026