Print readiness (READY / NOT READY / WHY)
Before printing, JARVIS checks nine readiness conditions and explains any failure.
TESTED , rung 3 of 8 Recorded 22 September 2026. Advanced Systems branch, not merged into production.
Technical
What it is
jarvis/fabrication/readiness.py: mesh validity, dimensions, bed fit, orientation, supports, slice, profiles, revision, displayed identity.
Truth ladder
Where it stands
Rung 3 of 8: TESTED
Automated tests exercise it in isolation, often against fixtures.
Project record: lane-tested only; canonical review REPAIR_REQUIRED_BEFORE_CANONICAL_ACCEPTANCE; matrix UNDISPOSITIONED
- CONCEPT Designed or specified. No working code yet.
- IMPLEMENTED Code exists. Nothing has demonstrated that it behaves correctly.
- TESTED Automated tests exercise it in isolation, often against fixtures.
- INTEGRATED Wired into the rest of JARVIS and tested across component boundaries.
- PRODUCTION-REACHABLE The owner can reach it through the real runtime path, not only through a test harness.
- LIVE-PROVEN A bounded probe ran the real code path on a booted JARVIS on the real machine and recorded evidence. The project treats live evidence as expiring after 24 hours, so every live reading here shows the date it was taken.
- FORMALLY VERIFIED Its critical property is checked by a proof or exhaustive verification.
- RELEASE-QUALIFIED Passed every qualification gate for a named release.
Limits
Limitations
- Not integrated into the canonical branch; a static review found three defects (orientation evidence, source owner, effective-profile gaps). Handoff and current-target commands were written but not executed. 'READY IS SOFTWARE READINESS AND NOTHING MORE.' Advanced Systems work lives on 2026-09-22 branches, not the production branch; most later commits are marked PENDING_PRIMARY_RELEASE under a measurement hold.
Record
Status history
- TESTED , rung 3 of 8 Recorded state: lane-tested only; canonical review REPAIR_REQUIRED_BEFORE_CANONICAL_ACCEPTANCE; matrix UNDISPOSITIONED
Only states recorded in the public export are listed. Earlier states may exist in the project’s private ledgers.
Connected work
Connected work
- Changelog Print readiness: READY / NOT READY / WHY, and a handoff that only asks 22 Sept 2026
- Roadmap Physical 3D printing DEFERRED
Neighbours