A research mission that leaves a receipt

A typed request started a research mission on Artemis news. It ran as three dependent steps within a 120-second budget, all three succeeded in 2.7 s of active time, and the dossier was saved as a durable, revisioned receipt.

LIVE-PROVEN , rung 6 of 8 What this run supports. Recorded 22 September 2026.

Real capture, captured 22 September 2026. A three-step research mission on Artemis news: 3 of 3 steps succeeded in 2.7 s of active time, and the dossier was saved as a durable, revisioned receipt. ShowsMissions run as durable steps with dependencies, a time budget and a saved receipt. Does not showA short mission. Long-running missions across restarts are not shown here.
What happens, step by step
  1. 0:00 Asked: “Start a research mission on the latest Artemis news, and show me the missions panel.”
  2. 0:04 3 of 3 steps succeeded in 2.7 s of active time · dossier saved as a durable receipt

Captured at revision 893913a9c

The missions panel: research mission SUCCEEDED, 3 of 3 steps, 120 s active budget, and a saved dossier revision with its evidence ID.
Real capture, captured 22 September 2026. A finished mission and the durable receipt it left.

Captured at revision 893913a9c

Asked

What was asked

Start a research mission: find the latest news about NASA's Artemis program, summarize it, and show me the missions panel while it runs.

Result

What happened

JARVIS called research.mission.start with two NASA sources, a 120-second active budget and a 15-minute expiry, then opened the missions panel. The mission ran describe, acquire source 1, acquire source 2, then synthesise and save, each depending on the one before. It succeeded 3 of 3 steps and saved dossier revision 1 with its evidence ID. JARVIS answered: "Check. Research is running. The missions widget is up."

Pipeline

Architecture path

  1. Typed request
  2. research.mission.start
  3. Durable steps with dependencies
  4. Dossier saved (revision 1)
  5. Missions panel

What this proves

  • A request becomes a durable mission with explicit steps, dependencies, a time budget and a deadline.
  • The mission ends with a saved, revisioned receipt that names its evidence.

What it does not prove

  • This mission was short and finished almost before its panel opened; pause, resume and survival across a restart are not shown.
  • The quality of the Artemis summary itself is not assessed here.
  • Recorded on 2026-09-22.

The run

Step Depends on Result
Acquire research source 1 describe succeeded
Acquire research source 2 source 1 succeeded
Synthesise and save the research dossier source 2 succeeded

The active time spent was 2.687 s of a 120 s budget. The receipt is marked durable: it survives the conversation and is kept as evidence under its own ID. The same panel also lists an earlier mission from a previous session as CANCELLED, which is a reminder that the list is a record, not a showcase.